Please fill out form and return to be added Core Builders master bid list. Form must be filled out completely and legibly.
Please fill out form and return to be added Core Builders master bid list. Form must be filled out completely and legibly.
Division | Scope of Work |
---|---|
01 | General Requirements (Consultants) |
02 | Existing Conditions (SWWPP Monitoring, Staking & Layout) |
03 | Concrete (Gypcrete, Structural Concrete) |
04 | Masonry |
05 | Metals (Gates, Metal Fabrications, Shades, Tellis and Awnings) |
06 | Wood, Plastics, and Composites (Wood Framing, Doors, Hardware, Trim) |
07 | Thermal and Moisture Protection (Sheet Metal, Flashing, Insulation, Roofing, Waterproofing) |
08 | Openings (Windows, Roll Up Doors, Storefront) |
09 | Finishes (Cement Plaster, Stucco, Ceramic Tile, Drywall, Floring, Painting) |
10 | Specialties (Signage, Toilet Accessories, Postal Mailboxes, Fireplaces, Toilet Partitions) |
11 | Equipment (Appliances, Window Cleaning Equipment) |
12 | Furnishings (Countertops, Window Coverings, Pre-fab Cabinets) |
13 | Special Construction |
14 | Conveying Equipment (Elevators, Trash Chutes) |
21 | Fire Suppression (Fire Spinklers) |
22 | Plumbing |
23 | Heating, Ventilating, and Air Conditioning (HVAC) |
25 | Integrated Automation |
26 | Electrical |
27 | Communications |
28 | Electronic Safety and Security |
31 | Earthwork (Grading & Paving) |
32 | Exterior Improvements (Landscaping, Site Concrete, Site Fencing & Gates, Stiping & Wheel Stops, Bumpers) |
33 | Utilities (Joint Trench, Underground Utilities) |
36 | Final Cleaning |